Mining & Resources
BHT LME04 Diversion Road Construction
Engineering and HSE support for a temporary MAR bypass at Hope Downs 1, delivering a clean close-out with all tests passed first submission.
Hope Downs 1 – Bedded Hilltop (BHT), WA (Pilbara)
Infrastructure & Transport • North Queensland • 5 months
QA/QC, HSE, and environmental compliance for a 322-metre revetment wall rehabilitation within an active bulk port, achieving zero non-conformances.
5 months
Duration
Zero
Non-conformances
Zero
HSE incidents
Mining & Resources
Engineering and HSE support for a temporary MAR bypass at Hope Downs 1, delivering a clean close-out with all tests passed first submission.
Hope Downs 1 – Bedded Hilltop (BHT), WA (Pilbara)
Infrastructure & Transport
On-site QA/QC engineering support for a high-stakes asphalt overlay at an operational airport, delivering zero audit findings at handover.
Paraburdoo, WA (Pilbara)